Residential Painting

The Mr. Magic Paint  Residential Painting Process

Exterior Residential Painting Process

When Mr. Magic Paint paints the exterior of your Orlando home, you can expect the following:

1. Move mulch, rocks and dirt away from the house 4-6 inches to allow us to paint below grade.
2. Pressure wash house and patio floors (if applicable) to remove loose paint and dirt.
3. Caulk around all windows, doors, door jambs and garage door.
4. Caulk front and back porch ceiling where wall and ceiling meet to conceal cracks.
5. Caulk front and back porch (or pool deck) floor where wall and floor meet.
6. Caulk (with clear caulk) all areas where wall and floor meet that will not be painted.
7. When caulking window frames or pool frames, we will use appropriate color match on frames (ex. Bronze, Tan).
8. Fix all cracks on walls and trim with elastomeric patch to cover cracks
9. Apply sealer/conditioner on repaints.
10. Careful covering of all surfaces to be protected from paint (ex. Windows, floors)
11. Spray and backroll 100% acrylic latex SuperPremium satin paint on walls.
12. Paint facia, soffits and gutters using 100% acrylic latex SuperPremium satin paint.
13. Paint garage door and all entrance doors using 100% acrylic latex SuperPremium satin paint.
14. Fix all cracks on patio and pool deck prior to painting.
15. Paint patio and pool deck with appropriate floor paint.

 

 

Interior Residential Painting Process

When Mr. Magic Paint paints the interior of your Orlando home, you can expect the following:

 

a.We will move the furniture and put it back in place when we are done.
b. 
Remove curtain rods and/or shades from windows.
c.  Caulk all trim when trim work will be painted.
d.  Caulk all cracks on corners and windows prior to painting.
e.
  Minor patching, sanding and texturing walls and ceilings as needed.

f. Apply two (2) coats of putty in holes on trim and doors (after priming).
g. Sand all trim and doors prior to painting.
h. Apply two (2) coats of paint on wall.
i.
  Cover and protect surfaces not to be painted.
j.
  Stain killing primer applied as needed.
k.
  All doors, jambs and other trim will be painted 1 or 2 coats as needed.
l.
  Basic clean up.
m.
  Premium grade products.
We asked all of our clients to ensure that the workspace is organized prior to our arrival so that our crews can maximize their use of time while at the job site. We do not empty cabinets; take down pictures, move china or any other items that may break in the process.